8-2-16

AC/DC PSU Replacement Procedure

8-2-16-1

Tools

N/A
8-2-16-2

Time Required

3min
8-2-16-3

Preparations

1.) Shut down the Venue Fit™ ultrasound unit, as described in
2.) While facing the rear side of the cart, Lock all cart casters.
3.) Disconnect the power cable from the wall out let and from the back side of the cart.
PSU
8-2-16-4
Removal Procedure
4.) Disconnect the power cable from the rear side of the system.
5.) Route the power cable out of the tilt cable holder.
6.) Slide upwards the left cart cable guide.
7.) using your thumb and pointing finger, remove the AC/DC PSU cover by a pinching both sides of the
cover and pulling it towards you.
Figure 8-59 Remove Cart Left cable guide
Figure 8-60 Remove Power Supply Cover
Chapter 8 - Replacement Procedures
VENUE FIT™ SERVICE MANUAL
Power
Shutdown.