3
|
Components
To install the reactor
3.12 Swing flap motor
3.12.1 Checking procedures
To perform an electrical check of the swing flap motor
Service manual
106
2 Remove the Faston connectors to disconnect the wires from the reactor.
3 Remove the 2 screws that fix the reactor to the switch box.
4 Remove the reactor.
b
a Reactor
b Screw
5 To install the reactor, see
1 Install the reactor on the correct location on the switch box.
b
a Reactor
b Screw
2 Install the 2 screws that fix the reactor to the switch box.
3 Connect the Faston connectors to the reactor.
Is the problem solved?
Yes
No
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
a
b
"3.11.2 Repair
procedures" [
a
b
Action
No further actions required.
Return to the troubleshooting of the
specific error and continue with the
next procedure.
RXQ25+35AMV1B + ARXQ25+35AMV1B + FTXQ25+35AMV1B +
4
105].
ATXQ25+35AMV1B
Split Sensira R32 BBOP
ESIE21-16 – 2022.02