Alternate On/Off Switch Installation (With Cast Iron Surround) - Empire Comfort Systems VFPC20IN73N-2 Installation Instructions And Owner's Manual

Table of Contents

Advertisement

ALTERNATE ON/OFF SWITCH INSTALLATION
Cast Iron Surrounds
Cast Iron Surrounds require a surround adaptor kit. See page 9
for kit information.
1.
Find the coiled low voltage wire assembly and ON/OFF
switch located in the instruction packet.
2a. Attach the flag terminal ends to the
terminals on the front terminal block of the MV gas valve.
See Figure 19 on page 21.
2b. Attach the flag terminals to the green and white wire
terminals located in the bottom of the insert near the gas
valve. See Figures 20 and 21 on page 21.
3.
Run the low voltage alternate switch wires up the back of
the right or left cast surround leg. Then secure them with the
wire clips provided.
4.
Install the switch bracket with screws as shown in Figure 6
to the back of the cast surround leg.
NOTICE: For right side leg installation, reverse switch
position in bracket.
5.
Install ON/OFF switch, and connect low-voltage wires from
gas valve (MV) or control module (IP).
6.
Attach cast surround panel assembly to the insert. Place the
cast surround assembly to the face of the insert. Align the
inside brackets on the cast surround with the flanges on the
insert. Install four #8 x 1/2 truss head sheet metal screws to
secure the surround.
43165-1-1221
"TH/TP"
and
"TH"
Figure 6
Page 15

Advertisement

Table of Contents
loading

Table of Contents