Cisco Catalyst 9130 Manual page 20

Table of Contents

Advertisement

Installing a CAT 6/6A Ethernet Cable and Gland Assembly to the Antenna
Caution
Step 5
Insert the Ethernet cable's unterminated end through the sealing nut end of the cable gland.
Pass the Ethernet cable through the appropriate size cable seal and pull several inches of cable through the
adapted components.
Step 6
Install an RJ-45 connector on the Ethernet cable's unterminated end using your Ethernet cable installation
tool.
Step 7
Carefully connect the RJ45 cable connector to the PoE port on the AP.
Step 8
Slide the cable gland with the rubber seal towards the AP and screw the threaded end of the body into the AP,
and hand-tighten.
Step 9
Use an adjustable wrench or a 28–mm wrench to tighten the body's threaded end into the enclosure. Tighten
to 15 lbf-in (17 kgf-cm) of torque.
Step 10
Use an adjustable wrench and tighten the thread-lock seal nut to 15 lbf-in (17 kgf-cm) of torque.
Step 11
Route your Ethernet cable and cut off any excess cable.
Step 12
Install an RJ45 connector on the unterminated cable end and insert it into the power injector.
Step 13
Turn on the power to the power injector.
Installing a CAT 6/6A Ethernet Cable and Gland Assembly to the Antenna
Figure 24: CAT 6/6a Cable Gland Assembly
1
2
3
4
Introduction to Cisco Catalyst 9130 Access Point with 9104 Stadium Antenna
20
If the cable gland and rubber gasket is not installed correctly, it causes the cable grip to leak.
CAT 6/6A RJ45 Plug
RJ45 wire load bar
Note the orientation into plug
Gasket
Clamp ring
Introduction to Cisco Catalyst 9130 Access Point with 9104 Stadium Antenna
5
Screw nut
6
Cable Seal (Cable OD range 5 mm to 7 mm)
7
Cable Seal (Cable OD range 7 mm to9 mm)
8
Cable sealing nut

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents