Figure 8-14 Siemens Echelon; Terminator; Figure 8-15 Echelon ® Lan Wiring Examples - Siemens GCP5000 Instruction & Installation Manual

Grade crossing predictor for electrified territory (gce)
Table of Contents

Advertisement

_________________________________________________________________________________________________________
A maximum of 8 connections (nodes) is recommended within 53 ft. (15.2 m) of cable.
If necessary additional cable may be added so that no more than 8 nodes are
located within any 53 ft./15.2 m length (see Figure 8-15).
If additional connections are required, contact Siemens Mobility, Inc. Technical
Support for assistance.
In general, the Echelon
performance to be connected at each end of the daisy-chained bus configuration
(see Figure 8-14).
The Echelon network can be connected to ECH1 on the 5000 GCP and the Echelon
terminator can be connected to ECH2 on the GCP5000 (GCE).
Order Network Echelon Termination Unit, part number 8000-80078-001
For further information, see Siemens Mobility, Inc. Echelon Configuration Handbook,
COM-00-07-09.
SIG-00-22-02
Version: B.1
®
network requires a terminator for proper data transmission
J101006_1715
10-10-06

Figure 8-14 Siemens Echelon

Figure 8-15 Echelon
8-43
DETAILED CASE AND MODULE DESCRIPTION
Echelon

Terminator

8000-80078-001
®
Terminator
®
LAN Wiring Examples
JUNE 2022 (Revised September 2022)
®