Download Print this page

Vision Fitness E4000 Assembly Manual page 6

Dual-action upright fitness cycle
Hide thumbs Also See for E4000:

Advertisement

STEP
2
STEP
6
BLUE BAG
2
• Loosen the Set Screw in the Arm
Axle with the 4
MM
• Slide the Front Arm Axle into the
plastic sleeve of the front foot. Slide a
Wavy Washer onto each end of the
axle.
• You will now need to disassemble
part of the roller assembly on the arm
crank. Please remove the Nylock Nut
(M8), the Washer (M8 x 17), the
Tension Spring, the Washer (M13),
and the Outside Roller. Repeat this
step on the left side.
• Slide the Right Arm onto the right
arm axle and the right arm crank.
Reinstall the Outside Roller, the
Washer (M13), the Tension Spring,
the Washer (M8x17), and the Nylock
Nut (M13). Repeat this step on the left
side
• Attach the Right Arm Cover to the
right arm. It should snap into place.
Repeat this step on the left side.
• Install the Right Mobile Wheel, the
Washer (M8x30), and the Nylock
Nut (M8) to each end of the axle.
Tighten with the closed wrench.
Repeat this step on the left side.
• Tighten the Set Screw in the Arm
Axle with the 4
MM
L-shaped Wrench.
L-shaped Wrench.

Advertisement

loading