Curtis Airpot G3 D500 User Manual page 21

Table of Contents

Advertisement

3.2
Powering Up the Brewer
6 Turn on the water supply valve.
6 Make sure that the circuit breaker supplying power
to the unit is on.
6 Turn the toggle switch on the back of the brewer
to the ON position. The water tank will start to fi ll.
While the tank is fi lling, inspect the water supply
line for leaks.
6 When the water in the tank rises to the
correct level, the heating elements will turn on
automatically. Depending on the incoming water
temperature and the electrical specifi cations, the
water tank typically requires 20 to 30 minutes to
reach the factory set operating temperature
6 When the water has heated, Ready to brew will be
displayed on the LCD screen.
• When operating the brewer at higher
elevations, reduce the factory set operating
temperature (200°F/92°C) by 2°F/1°C for
each 1000 ft./300 m of elevation above 4000
ft./1200 m.
6 Perform a brew cycle of a least 350 ml to purge any
remaining air from the system. During the initial
brew cycle and whenever the fi lter is replaced, you
may hear the sounds of air being purged from the
fi lter, tubing and water tank.
6 If the unit is equipped with a hot water faucet, fi ll a
coffee cup with hot water to purge air from the hot
water line.
User manual Curtis G3 Airpot Brewer
Operation | Powering Up the Brewer
Programming guide
 p age 24
IMPORTANT
Programming guide
 p age 24
21

Advertisement

Table of Contents
loading

Table of Contents