a. The VS LED lights.
b. The ETH1/ETH2 LED lights on the connected port.
c.
The MOD and NET LEDs are lit.
d. The IO-Link LEDs
are lit if an IO-Link device is attached.
Note: It takes approximately 25 seconds after power-up for the IO-Link
Master to be ready for operation.
If a PLC is connected, the NET LED is lit and green.
Mounting the IOLM
Use the following procedure to mount the IOLM. You can mount the IOLM
on a mounting panel or a machine.
1. Verify that the mounting surface is level (flat) to prevent mechanical
stress to the IOLM.
2. Attach the IOLM to the surface with two 6 mm (¼") screws and
washers, torque down to 8 Nm (70.8 in-lbs).
14
IO-LINK Master W/ PROFINET and Modbus Quick Start Guide
flash (if no IO-Link device attached) or
GFK-3213A