PCBs
Step
2
Release the harness
from the hook.
3
Disconnect the
connector [S49].
4. Remove the control PCB.
1
Unfasten the 3 hooks
and remove the control
PCB.
2
Pull out the earth /
ground wire (yellow /
green) from the
terminal board.
3
Pull out the 4 terminals
from the terminal board.
12
Procedure
Hook
[S49]
Control PCB
Hook
Terminal
[S49]: to control PCB
(R18718)
Hook
(R9517)
When reassembling, make
sure to connect the
connectors as shown in the
illustrations below.
Type 1
Earth / ground wire
(yellow / green)
Red
(R22119)
White
Type 2
Black
White
(R9519)
Si041352EB
Points
Earth / ground
(yellow / green)
FRONT
Black
Earth / ground (green)
(R22120)
Earth / ground
(yellow / green)
FRONT
Red
Earth / ground (green)
(R22121)
Removal Procedure