Rheem GHE 119-500 Use & Care Manual page 19

Commercial high efficiency water heater
Hide thumbs Also See for GHE 119-500:
Table of Contents

Advertisement

POWER VENT INSTALLATION:
Power venting is where the indoor air is used and
the exhaust is vented to the outside. Venting may
be run horizontally through an outside wall or
vertically through a roof using either 4" (10.2 cm)
or 6" (15.2 cm) diameter PVC, ABS or CPVC. This
water heater is supplied with a screened intake
elbow and exhaust coupling referred to as the air
intake terminal and the exhaust vent terminal
In a horizontal application, it is important that con-
densate not be allowed to buildup in the exhaust
Multiple Unit Venting
NOTICE: All spacing is horizontal. DO NOT
stack kits vertically.
Figure: 17
24" to 36"
Heater #1
Intake
24" Min,
between
24" to 36"
heater
Heater #1
Intake
Exhaust
Exhaust
Example of 2 Units' Vents.
24" to 36"
Heater #2
vents
Intake
Exhaust
Example of 4 Units' Vent.
Installation
vent pipe. To prevent this from happening, the pipe
should be installed with a slight upward slope of
1/8" per foot. The vent system must be supported
every 5 feet of vertical run and every 3 feet of hori-
zontal run of vent pipe length.
CAUTION
!
Failure to properly support the vent piping with
hangers and clamps may result in damage to the
water heater or venting system.
24" Min,
between heater
vents
Intake
19
24" to 36"
Heater #2
Exhaust
Intake
Intake
Exhaust
Exhaust

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ghe 125-500a

Table of Contents