Download Print this page
Crown GS-60 Installation & Operation Manual

Crown GS-60 Installation & Operation Manual

Gas floor model braising pan with manual gearbox tilt

Advertisement

Quick Links

Installation & Operation Manual
Gas Floor Model Braising Pan
With Manual Gearbox Tilt
GS-30, GS-40, GS-40N & GS-60
Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury
or death. Read the installation, operating and maintenance instructions thoroughly before installing or
M
R
ANUAL 10152
EV 5 (05/22)
$21.00
servicing this equipment.
CROWN FOOD SERVICE EQUIPMENT
70 Oakdale Road, Downsview (Toronto) Ontario, Canada, M3N 1V9
Telephone: 919-762-1000
Model GS-40N
WARNING
A Middleby Company
www.crownsteamgroup.com
IMPORTANT FOR FUTURE REFERENCE
Please complete this information and retain this
manual for the life of the equipment:
Model #: ___________________________
Serial #: ___________________________
Date Purchased: _____________________
Gas Floor Model Braising Pan
with Manual Gearbox Tilt
M
S
ANUAL
ECTION
CO

Advertisement

loading

Summary of Contents for Crown GS-60

  • Page 1 Date Purchased: _____________________ Installation & Operation Manual Gas Floor Model Braising Pan With Manual Gearbox Tilt GS-30, GS-40, GS-40N & GS-60 Model GS-40N WARNING Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
  • Page 2: Important Notes For Installation And Operation

    Contact the factory, the factory representative or a local service company to perform maintenance and repairs should the appliance malfunction. Refer to warranty terms. Copyright © 2021 by Crown. All rights reserved. Published in the United States of America. PAGE OF 20 INSTALLATION &...
  • Page 3: Table Of Contents

    Gas Floor Model Braising Pan With Manual Gearbox Tilt Table of Contents RETAIN THIS MANUAL FOR FUTURE REFERENCE. Table of Contents Important Notes For Installation and Operation ..............2 Service Connections ......................4 Installation Instructions ......................8 Operation ..........................10 Preventive Maintenance .......................
  • Page 4: Service Connections

    GS-30 100,000 GS-40 720 lbs. [327 kg] Back 6” (152 mm) GS-40 125,000 As continued product improvement is a policy of Crown, specifications are subject to changge without notice. PAGE OF 20 INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22)
  • Page 5 Sides GS-30 100,000 GS-40 760 lbs. [345 kg] Back 6” (152 mm) GS-40 125,000 As continued product improvement is a policy of Crown, specifications are subject to changge without notice. INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22) PAGE OF20...
  • Page 6 (152 mm - 356 mm) (279 mm - 356 mm) * For use on non-combustible floors only. As continued product improvement is a policy of Crown, specifications are subject to changge without notice. PAGE OF 20 INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22)
  • Page 7 11” - 14” (279 mm - 356 mm) Back 6” (152 mm) * For use on non-combustible floors only. As continued product improvement is a policy of Crown, specifications are subject to changge without notice. INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22) PAGE OF20...
  • Page 8: Installation Instructions

    Gas Floor Model Braising Pan With Manual Gearbox Tilt NSTALLATION NSTALLATION NSTRUCTIONS NPACKING IMMEDIATELY INSPECT FOR SHIPPING DAMAGE Immediately after unpacking the steamer, check for possible shipping damage. If the steamer is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery. Before installing, verify that the type of gas supply (natural or propane) and electrical service agree with the specifications on the rating plate located on the left side panel as you face the front of the braising pan.
  • Page 9 Gas Floor Model Braising Pan With Manual Gearbox Tilt NSTALLATION eveling and nchoring 1. Set the appliance in place and level left to right and front-to-back using spirit level. 2. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet. 3.
  • Page 10: Operation

    Gas Floor Model Braising Pan With Manual Gearbox Tilt PERATION PERATION CAUTION The appliance and its parts are hot. Use care when operating, cleaning and servicing the appliance. Before First Use Using a non-corrosive, grease-dissolving commercial cleaner, clean the protective metal oils from all surface parts and the interior of the tilting braising pan.
  • Page 11 Gas Floor Model Braising Pan With Manual Gearbox Tilt PERATION Daily Shutdown Procedure Turn THERMOSTAT dial to OFF. Close manual gas shutoff valve. Tilting the Braising Pan 1. DO NOT try to tilt braising pan with lid down. 2. Make sure the receiving pan is in place. 3.
  • Page 12: Preventive Maintenance

    Preventive Maintenance Gas Floor Model Braising Pan With Manual Gearbox Tilt Preventative Maintenance WARNING Disconnect the power supply to the appliance before cleaning or servicing. Cleaning After each use, allow the tilting braising pan to cool and clean it. Keep exposed cleanable areas of the tilting braising pan clean at all times.
  • Page 13: Cooking Guidelines

    Gas Floor Model Braising Pan With Manual Gearbox Tilt OOKING UIDELINES OOKING UIDELINES The guidelines given below are suggested quantities, temperature settings, and estimated numbers of orders per load and per hour. When two temperatures are given, the first is to start the product, and the second to finish the product. The following temperatures should be used: Cooking Method Temperature (°F)
  • Page 14 Gas Floor Model Braising Pan With Manual Gearbox Tilt OOKING UIDELINES GS-30 PER LOAD GS-40 PER LOAD PORTION BATCHES ITEM TEMP. (EF) SIZE PER HOUR QTY. PORTIONS QTY. PORTIONS VEGETABLES (continued) FRESH (continued) Broccoli 3 oz 25 lb 40 lb Cabbage 3 oz 20 lb...
  • Page 15 Gas Floor Model Braising Pan With Manual Gearbox Tilt OOKING UIDELINES GS-30 PER LOAD GS-40 PER LOAD PORTION BATCHES ITEM TEMP. (EF) SIZE PER HOUR QTY. PORTIONS QTY. PORTIONS MEAT-POULTRY (continued) FRANKFURTERS Grilled 2 oz 22 lb 33 lb Boiled 2 oz 16 lb 25 lb...
  • Page 16: Troubleshooting

    Troubleshooting Gas Floor Model Braising Pan With Manual Gearbox Tilt ROUBLESHOOTING Burners No Not Come On 1. Gas supply to unit is “OFF”. 2. Manual shut off valve is “OFF”. 3. Thermostat is not turned “ON”. 4. Pan not in lowest position. 5.
  • Page 17 Gas Floor Model Braising Pan With Manual Gearbox Tilt Notes Notes INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22) PAGE OF20...
  • Page 18 Notes Gas Floor Model Braising Pan With Manual Gearbox Tilt Notes PAGE OF 20 INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22)
  • Page 19 Gas Floor Model Braising Pan With Manual Gearbox Tilt Notes Notes INSTALLATION & OPERATION MANUAL 10152 REV 5 (05/22) PAGE OF20...
  • Page 20 With Manual Gearbox Tilt A product with the Crown name incorporates the best in durability and low maintenance. We all recognize, however, that replacement parts and occasional professional service may be necessary to extend the useful life of this appliance.

This manual is also suitable for:

Gs-40Gs-40nGs-30