Cisco SFS 7024 Hardware User's Manual page 40

Cisco systems infiniband server switch users guide
Table of Contents

Advertisement

Clear the area of any unnecessary materials.
Step 1
Attach the clip of the ESD wristband (strap) to bare metal on the cabinet. Put the wristband around one
Step 2
wrist with the metal button against the skin.
Lift the switch and, from the front of the cabinet, slide it onto the rails. The fans and power supplies are
Step 3
on the front of the chassis; leaf modules are to the rear.
Caution
Never lift the switch with the handles on the spine modules, leaf modules, power supplies, and fan trays.
These handles are not designed to support the weight of the SFS 7024.
Tighten the screw on the bottom of each side of the chassis into the corresponding bottom hole of the
Step 4
front flange of each rail.
Figure 6
On each side of the chassis, install a screw and caged nut into the three holes in the chassis sheet metal.
Step 5
Cisco SFS 7024 InfiniBand Server Switch Hardware Users Guide
22
Secure Chassis to Rail
Install 1 screw into
bottom hole on each rail
Chapter
OL-8794-04

Advertisement

Table of Contents
loading

Table of Contents