MERCHANDISERS SHIPPED

WITH END INSTALLED

Be careful not to damage the factory installed end
while moving the case. Tools must be positioned
past the end and beneath the merchandiser's
support bar.
WARNING
!
Do NOT remove shipping braces until
the merchandisers are positioned
for installation.

SHIPPING BRACES

Move the merchandiser as close as possible to its
permanent location and then remove all packaging.
Check for damage before discarding packaging.
Remove all separately packed accessories such as
kits and shelves.

LEVELING

Merchandisers must be installed level to ensure
proper operation of the refrigeration system and
to ensure proper drainage of defrost water. When
leveling merchandisers, use a carpenter's level as
shown. Leveling shims are provided with each
merchandiser for use if needed. The shims are big
enough so that you can level adjoining merchan-
disers at the same time using one shim.
NOTES:
• B
EGIN LINEUP LEVELING FROM THE HIGHEST POINT
.
OF THE STORE FLOOR
• If shimming two corners, check to see if a shim is
needed in the center of the merchandiser. If a gap
exists between the support rail of the merchandiser
and the floor, a shim should be placed in the center.
P/N 0453523
Level
Leveling E1
Merchandisers
Level
Leveling E2,
E3, E4 and E5
Merchandisers
NOTE:
Do not place levels on
Display Pans or on Shelves.
Shim

Advertisement

Table of Contents
loading

Table of Contents