Shindaiwa EB910RT Operator's Manual page 21

Table of Contents

Advertisement

EB910 / RT
3.
Assemble swivel pipe (C) into
flexible pipe (B).
4.
Assemble flexible pipe (B) to
elbow (D) on blower and tighten
clamps (A).
Note: A light lubricant may be
used to ease assembly of
flexible pipe to blower
elbow.
5.
Loosen knob (E) completely
and expand stick handle clamp.
Align wire (G) in handle with
grounding strip on swivel pipe
(C).
6.
Slide stick handle onto swivel
pipe (C). Stick handle (F)
should be angled away from
operator.
7.
Position stick handle (F) for
comfortable operation. Tighten
knob (E).
8.
Assemble straight pipe (J) onto
swivel pipe (C), until you feel
light resistance. Hold swivel
pipe and turn straight pipe
clockwise, engaging positive
locking channels, until
connection is firm. Do not force
connection.
9.
Assemble end pipe (K) to
straight pipe (J) the same as in
step 8.
X7501200801
© 09/22 ECHO Incorporated
D
A
B
A
G
C
C
ASSEMBLY
C
E
F
J
K
21
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eb810rt

Table of Contents