Empire Comfort Systems MILLIVOLT DVCD FP3-4 Series Installation Instructions Manual page 15

Direct-vent zero clearance gas fireplace heater
Table of Contents

Advertisement

Frame the Fireplace Opening
1.
Choose fireplace location.
2.
Frame in fireplace opening with a plate across the top. It is
important to allow for the finished fireplace face when setting
the depth of the frame.
3.
Bend the nailing flanges 90 degrees.
USED TO
ATTACH TO
FRAMING
38712-4-0920
INSTALLATION (CONT'D)
PLATE
Figure 17
NOT USED
½" BOARD
5/8" BOARD
Figure 18
4.
Attach fireplace to frame using adjustable nailing flanges.
Set the nailing flange depth to suit the wall material
(adjustable to 1/2 or 5/8 inch).
5.
Secure the nailing flanges to the fireplace with #10 x ½ inch
screws (provided).
6.
Secure the nailing flanges to the framing with nails or other
suitable fasteners (not provided). See Figure 20.
NAIL OR OTHER SUITABLE FASTENER
Figure 19
Figure 20
Page 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intermittent pilot dvcd fp7-4 series

Table of Contents