Biasi RCB 3S Series Installation, Operating And Maintenance Manual page 5

Pressurised steel boilers
Table of Contents

Advertisement

Available languages

Available languages

1
GENERAL WARNINGS........................................................................................................................... 39
2
TECHNICAL SPECIFICATIONS ............................................................................................................. 40
2.1
RCB 3S/RCB 3S M 70÷1300 BOILER.............................................................................................. 40
2.2
RCB 3S/RCB 3S M 1400÷3500 BOILER.......................................................................................... 42
2.3
RCB 3S 4000÷6000 BOILER ............................................................................................................ 43
3
INSTALLATION ....................................................................................................................................... 44
3.1
THERMAL PLANT ............................................................................................................................ 44
3.1.1
BOILER ROOM.......................................................................................................................... 44
3.1.2
FLUE .......................................................................................................................................... 44
3.2
HYDRAULIC CONNECTION ............................................................................................................ 45
3.2.1
1)
45
3.2.2
2)
45
3.3
ELECTRICAL CONNECTION........................................................................................................... 46
3.4
RCB 3S/RCB 3S M OPTIONAL CONTROL PANEL (FIG. 3)........................................................... 46
3.5
RCB 3S 4000÷6000 CONTROL PANEL........................................................................................... 46
WIRING DIAGRAM ......................................................................................................................................... 46
3.6
INVERTING THE DOOR APERTURE.............................................................................................. 47
3.7
BURNER CONNECTION.................................................................................................................. 47
4
ASSEMBLY.............................................................................................................................................. 48
4.1
RCB 3S M ASSEMBLY (FIG. 6-7) .................................................................................................... 48
4.2
RCB 3S/RCB 3S M 70÷400 BOILER CASINGS (FIG. 8) ................................................................. 50
4.3
RCB 3S/RCB 3S M 500÷1300 BOILER CASINGS (FIG. 9) ............................................................. 51
5
START UP................................................................................................................................................ 52
5.1
PRELIMINARY CHECKS.................................................................................................................. 52
5.2
WATER TREATMENT ...................................................................................................................... 52
5.3
FILLING THE SYSTEM..................................................................................................................... 52
6
OPERATION ............................................................................................................................................ 53
6.1
OPERATING CHECKS ..................................................................................................................... 53
6.2
CLEANING AND SERVICING .......................................................................................................... 54
ENGLISH
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rcb 3s m series

Table of Contents