Inverting The Door Aperture; Burner Connection - Biasi RCB 3S Series Installation, Operating And Maintenance Manual

Pressurised steel boilers
Table of Contents

Advertisement

Available languages

Available languages

3.6

INVERTING THE DOOR APERTURE

If the door is to be opened to the opposite side, act as follows:
1. Switch the outside nut (or bush) of one hinge with the diametrically opposite closure bush; then at the
hinge side, fasten the cone to the door with the inside nut.
2. Repeat the operation for the other hinge.
3. For any adjustment needed, act on the specific hinge nuts.
3.7

BURNER CONNECTION

Before installation you are advised to thoroughly clean the inside of all the fuel supply system pipes in order to
remove any foreign matter that could affect correct operation of the boiler. See technical specification tables
and check the max pressure value inside the furnace. The value found on the table may also increase by 20% if
heavy oil is used instead of gas or light oil; furthermore the following checks should also be carried out:
a) Check the internal and external seal of the fuel supply system;
b) Regulate the fuel flow according to the power required by the boiler;
c) Check that the boiler is fired by the correct type of fuel;
d) Check that the fuel supply pressure is within the values specified on the burner rating plate;
e) Check that the fuel supply system is sized for the maximum flow rate necessary for the boiler and that it
is provided with all control and safety devices provided for by the regulations referred to above;
f)
Check that the boiler room vents are sized in order to guarantee the air flow established by the regula-
tions referred to above and that they are in any case sufficient to obtain perfect combustion.
In particular, when using gas:
g) Check that the feeding line and the gas ramp comply with the regulations in force;
h) Check that all the gas connections are sealed;
i) Check that the gas pipes are not used as earth connections for electrical appliances.
If the boiler is not going to be used for some time, close the fuel supply cock or cocks.
IMPORTANT: check that the air spaces between the burner draught tube and the manhole are suita-
bly filled with thermoinsulating material (Fig. 5). The boiler is supplied with a piece of ceramic rope.
Should this not suit the burner used, use a braid of different diameter bur same material.
Fig. 5
1
All details on the draught tube length (P6), the diameter of the burner hole (Øb) and the pressurization are
included in the par. Technical Specifications.
ATTENTION:
must have cement insulation and special tie rods. Any alterations
and/or lack of communication during the selling phase shall nullify
the warranty conditions.
P6
3
4
when using oil or bio-gas for operation, the door
ENGLISH
KEY:
1. Burner
2. Manhole
3. Thermoinsulating material
4. Flange
2
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rcb 3s m series

Table of Contents