Piping Installation; Preparing Refrigerant Piping; Refrigerant Piping Requirements; Refrigerant Piping Length And Height Difference - Daikin ARXF20C5V1B Installer's Reference Manual

Hide thumbs Also See for ARXF20C5V1B:
Table of Contents

Advertisement

7
|

Piping installation

7 Piping installation
In this chapter

7.1 Preparing refrigerant piping

7.1.1 Refrigerant piping requirements

7.1.2 Refrigerant piping length and height difference

Installer reference guide
30
7.1
Preparing refrigerant piping ...................................................................................................................................................
7.1.1
Refrigerant piping requirements ...........................................................................................................................
7.1.2
Refrigerant piping length and height difference ...................................................................................................
7.1.3
Refrigerant piping insulation..................................................................................................................................
7.2
Connecting the refrigerant piping..........................................................................................................................................
7.2.1
About connecting the refrigerant piping...............................................................................................................
7.2.2
Precautions when connecting the refrigerant piping............................................................................................
7.2.3
Guidelines when connecting the refrigerant piping..............................................................................................
7.2.4
Pipe bending guidelines .........................................................................................................................................
7.2.5
To flare the pipe end..............................................................................................................................................
7.2.6
Using the stop valve and service port....................................................................................................................
7.2.7
To connect the refrigerant piping to the outdoor unit .........................................................................................
7.3
Checking the refrigerant piping..............................................................................................................................................
7.3.1
About checking the refrigerant piping...................................................................................................................
7.3.2
Precautions when checking the refrigerant piping ...............................................................................................
7.3.3
To check for leaks...................................................................................................................................................
7.3.4
To perform vacuum drying ....................................................................................................................................
7.4
Charging refrigerant ...............................................................................................................................................................
7.4.1
About charging refrigerant ....................................................................................................................................
7.4.2
About the refrigerant .............................................................................................................................................
7.4.3
To determine the additional refrigerant amount..................................................................................................
7.4.4
To determine the complete recharge amount......................................................................................................
7.4.5
To charge additional refrigerant ............................................................................................................................
7.4.6
To fix the fluorinated greenhouse gases label.......................................................................................................
INFORMATION
Also read the precautions and requirements in the
precautions" [
4
Piping material: Phosphoric acid deoxidised seamless copper.
Piping diameter:
Liquid piping
Gas piping
Piping temper grade and thickness:
Outer diameter (Ø)
6.4 mm (1/4")
9.5 mm (3/8")
(a)
Depending on the applicable legislation and the maximum working pressure of the unit
(see "PS High" on the unit name plate), larger piping thickness might be required.
What?
Maximum allowable pipe length
 6].
Ø6.4 mm (1/4")
Ø9.5 mm (3/8")
Temper grade
Annealed (O)
≥0.8 mm
Annealed (O)
"2  General safety
(a)
Thickness (t)
Distance
20 m
(A)RXF20~42C5V1B
4P519439-10J - 2021.06
30
30
30
31
31
31
31
33
33
33
34
36
36
36
37
37
37
39
39
40
40
41
41
41
Ø
t
R32 split series

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents