Piping Installation; Preparing Refrigerant Piping; Refrigerant Piping Requirements; Refrigerant Piping Material - Daikin VRV 5 S Series Installer And User Manual

System air conditioner
Table of Contents

Advertisement

18 Piping installation

In this chapter

18.1 Preparing refrigerant piping

18.1.1 Refrigerant piping requirements

18.1.2 Refrigerant piping material

RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1D - 2023.02
18.1
Preparing refrigerant piping ...................................................................................................................................................
18.1.1
Refrigerant piping requirements ...........................................................................................................................
18.1.2
Refrigerant piping material ....................................................................................................................................
18.1.3
To select the piping size .........................................................................................................................................
18.1.4
To select refrigerant branch kits............................................................................................................................
18.1.5
Refrigerant piping length and height difference ...................................................................................................
18.2
Connecting the refrigerant piping..........................................................................................................................................
18.2.1
About connecting the refrigerant piping...............................................................................................................
18.2.2
Precautions when connecting the refrigerant piping............................................................................................
18.2.3
Pipe bending guidelines .........................................................................................................................................
18.2.4
To remove the spun pipes .....................................................................................................................................
18.2.5
To braze the pipe end ............................................................................................................................................
18.2.6
Using the stop valve and service port....................................................................................................................
18.2.7
To connect the refrigerant piping to the outdoor unit .........................................................................................
18.2.8
To connect the refrigerant branching kit ..............................................................................................................
18.3
Checking the refrigerant piping..............................................................................................................................................
18.3.1
About checking the refrigerant piping...................................................................................................................
18.3.2
Checking refrigerant piping: General guidelines ...................................................................................................
18.3.3
Checking refrigerant piping: Setup ........................................................................................................................
18.3.4
To perform a leak test............................................................................................................................................
18.3.5
To perform vacuum drying ....................................................................................................................................
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant piping.
INFORMATION
Also read the precautions and requirements in the
4
precautions" [
Foreign materials inside pipes (including oils for fabrication) must be
≤30 mg/10 m.
Piping material: phosphoric acid deoxidised seamless copper
Flare connections: Only use annealed material.
Piping temper grade and thickness:
Outer diameter (Ø)
6.4 mm (1/4")
9.5 mm (3/8")
12.7 mm (1/2")
15.9 mm (5/8")
19.1 mm (3/4")
 8].
Temper grade
Annealed (O)
Annealed (O)
Half hard (1/2H)
18
Piping installation
|
"2  General safety
(a)
Thickness (t)
≥0.80 mm
≥0.99 mm
≥0.80 mm
Installer and user reference guide
81
81
81
82
83
84
85
85
85
86
86
87
88
89
91
92
92
93
93
94
95
Ø
t
81

Advertisement

Table of Contents
loading

Table of Contents