Checking 8510 System Operation; Procedure - Agilent Technologies 85103E Installation Manual

Network analyzer
Table of Contents

Advertisement

85103E Upgrade Package (8510A to 8510C)

Checking 8510 System Operation

Checking 8510 System Operation
Use this procedure to ensure that the 8510A system works properly.

Procedure

1. Configure the system as shown in
2. Turn on the instruments in the following order:
a. Source (be sure to turn the switch to power on, not standby)
b. Test set
c. Analyzer
3. On the 85102, press the green preset key.
4. Does the system pass self-test (85101 self tests, 85102 running error messages, and test
set unratio power tests) and display a log MAG S
upgrade until the system has been serviced.
5. Initialize a blank or used tape (customer supplied), as follows:
a. Load the tape (with write-protect off).
b. On the 85102, press
c. On the 85101, select
6. Does the system initialize the tape (this takes approximately three minutes) and
display TAPE INITIALIZED ?
NOTE
The tape drive must be working to transfer information from tape to
disk.
7. If the system displays a self-test,
check the equipment setup. Do not perform the upgrade until either you correct the
setup problem, or you have the system serviced.
8. Continue with
"Converting Files from Tape to Disk."
1. You may have to rely on the red LEDs rather than the display.
8
Figure
1.
AUXILIARY MENUS TAPE.
INITIALIZE TAPE YES.
1
running error message, or unratio power test failure,
85103E Performance Upgrade Installation Manual
trace? If not, do not perform the
11

Advertisement

Table of Contents
loading

Table of Contents