Buzzer; Contactor - Henny Penny BCM-110 Technical Manual

Blast chiller/freezer
Hide thumbs Also See for BCM-110:
Table of Contents

Advertisement

2-6. BUZZER

2-7. CONTACTOR

603
1. Remove the electrical power to the unit.
To avoid electrical shock or property damage, move the
power switch to OFF and disconnect main circuit breaker,
or unplug cord at wall receptacle.
2. Using a Phillips head screwdriver, remove the two screws
securing the front panel, and lower the panel.
3. Remove the two bolts (under unit) securing the control box.
4. Pull the box from the front of the unit.
5. Remove the four screws securing the control box top and
pull the top from the box.
6. Label and remove the wires to the buzzer.
7. Remove the two screws securing the buzzer to the bracket
and remove the buzzer from the bracket.
8. Install new buzzer in reverse order.
1. Remove the electrical power to the unit.
To avoid electrical shock or property damage, move the
power switch to OFF and disconnect main circuit breaker,
or unplug cord at wall receptacle.
2. Follow steps 2 through 5 in the Control Board Section.
3. Using a flathead screwdriver, remove the two screws
securing the bracket to the box, and remove the bracket.
4. Label and remove the wires from the contactor.
5. Slide the contactor off the retainer.
6. Install new contactor in reverse order.
Model BCF-24/65/110, BCM-110
2-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bcf-65Bcf-110Bcf-24

Table of Contents