Travis Industries 564 SS Installation Manual page 55

Built-in direct vent fireplace
Hide thumbs Also See for 564 SS:
Table of Contents

Advertisement

Finalizing the Installation
7
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve. Check the pilot. Adjust if necessary.
WARNING:
When lighting or re-lighting the pilot, the glass must be removed (see page 43).
To adjust the pilot flame, turn this screw (NOTE: if totally
unscrewed gas will come out of this port). Clockwise
lowers the flame while counter-clockwise raises it.
© Travis Industries
(for qualified installers only)
The pilot flame must contact the thermocouple and
thermopile (see the illustration below). Adjust the pilot up or
down as necessary.
Standard
Screwdriver
4070620
55
100-01199_000

Advertisement

Table of Contents
loading

Table of Contents