Warning Installation, repair and maintenance must only be
carried out by a competent person. This document is intended for
use by competent persons.
Installation must be carried out in accordance with the prevailing regula-
tions, the code of practice and the recommendations in these instructions.
Installation must also respect the following points:
This instruction manual and any other applicable documentation
Building Regulations
British Standards
Gas Safety Regulations
Water Supply Regulations
5.2.1

Gas supply

The gas installation should be in accordance with the relevant standards.
In GB this is BS 6891 (NG). In IE this is the current edition of IS 813 Do-
mestic Gas Installations.
The connection to the appliance is a 22mm copper tail located at the rear
of the gas service cock.
Ensure that the pipework from the meter to the appliance is of adequate
size, and the demands of any other gas appliances in the property are tak-
en into consideration. Do not use pipes of a smaller diameter than the
boil-er gas connection (22mm) UNLESS the stated gas rate can be
achieved with pipe of lesser diameter and with all other gas appliances
operating at maximum rate.
5.2.2

Electrical supply

External wiring must be correctly earthed, polarised and in accordance
with relevant regulations/rules. In GB this is the current IEE Wiring
Regula-tions. In IE reference should be made to the current edition of
ETCI rules.
The mains supply is 230V ~ 50Hz fused at 3A.
Important The method of connection to the electricity supply must
facilitate complete electrical isolation of the appliance. Connection
may be via a fused double-pole isolator with a contact separation
of at least 3mm in all poles and servicing the boiler and system
controls only.
The boiler must be connected to the mains fused 3A 230V 50HZ
supply & control system using cable of 3 core 0.75mm 3183Y multi
strand flexible type.