SERVICE & INTERIM BOILER WORK RECORD
It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers' instructions, and that the appropriate service /
interim work record is completed.
Service provider
When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers' instructions. Always use the
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Telephone N
o
:
Max rate CO
ppm
Min rate
CO
ppm
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Telephone N
:
o
Max rate CO
ppm
Min rate
CO
ppm
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Telephone N
o
:
Max rate CO
ppm
Min rate
CO
ppm
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
© Heating and Hotwater Industry Council (HHIC)
Date:
delete as appropriate
Company name:
Gas Safe registration N
o
:
CO ²
% CO/CO ²
CO ²
% CO/CO ²
OR
ft
3
/h
Yes
No
yes
Date:
delete as appropriate
Company name:
Gas Safe registration N
:
o
CO ²
% CO/CO ²
CO ²
% CO/CO ²
OR
ft
3
/h
Yes
No
yes
Date:
delete as appropriate
Company name:
Gas Safe registration N
o
:
CO ²
% CO/CO ²
CO ²
% CO/CO ²
OR
ft
3
/h
Yes
No
yes
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Telephone N
Max rate CO
Min rate
CO
yes
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
System inhibitor concentration has been checked and
n/a
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Telephone N
Max rate CO
Min rate
CO
yes
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
System inhibitor concentration has been checked and
n/a
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Telephone N
Max rate CO
Min rate
CO
yes
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
System inhibitor concentration has been checked and
n/a
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
Company name:
o
:
Gas Safe registration N
ppm
CO ²
CO ²
ppm
m
3
/h
OR
Yes
delete as appropriate
delete as appropriate
Company name:
:
Gas Safe registration N
o
CO ²
ppm
ppm
CO ²
m
3
/h
OR
Yes
delete as appropriate
delete as appropriate
Company name:
:
Gas Safe registration N
o
CO ²
ppm
ppm
CO ²
m
3
/h
OR
Yes
delete as appropriate
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
Date:
:
o
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
Date:
:
o
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
www.centralheating.co.uk

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

430 combi 2424 combi lpg 2430 combi lpg 2

Table of Contents