Ferris SNAPPER PRO FAST-Vac 61 Operator's Manual page 28

Table of Contents

Advertisement

Installation
IS3000Z & IS3100Z Series
1. Measure and mark the front main frame tubes to
the dimensions shown in Figure 41.
2. Using a 3/8" drill bit, drill one (1) hole in each of
the main frame tubes from the outside surface of
the tube.
3. Slide the weight mount rack into the main frame
tubes and align with the holes drilled through the
frame (see Figure 42). It may require you drive
the arms into the frame tubes using a wooden
block and hammer.
4. Finish drilling through the opposite wall of the
frame tubes using the weight rack as a guide.
5. Install the 3/8" bolts from the inside of the frame
rail and fasten securely with the nylon lock nuts.
6. Install the counter weights supplied with the grass
collector on the weight mount rack (see Figure
43).
7. Install the weight retainer rod through the weight
mount rack and secure with the hairpin clips (see
Figure 43).
26
1-1/4"
(3,18cm)
Figure 41. Hole Location
Figure 42. Weight Rack Installation
Figure 43. Weight & Retainer Rod Installation
www.ferrismowers.com | www.snapperpro.com
5"
(12,7cm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

560000556000065600008560000956000575600060 ... Show all

Table of Contents