6.
Install the new steel plate into the fuse
compartment with the previously removed bolts.
7.
Connect the large-ring terminal, from the wire
harness, to the stud on the junction block
20).
8.
Connect the small-ring terminal from the wire
harness to 1 of the screws on the ground-block
terminal
(Figure
20).
Figure 20
1. Battery
2. Large-ring terminal
9.
Install the module to the steel plate with the
bracket and 2 bolts (#8 x 1/2 inch); refer to
Figure
19.
Note:
Do not overtighten the screws.
10.
Install the compartment clamp and seal to the
traction unit with the flange-head screw
17).
11.
Route the front end of the wire harness under
the operator platform to the front of the traction
unit
(Figure
21).
(Figure
g371732
3. Small-ring terminal
(Figure
1. Right front-light
conncector
2. Connectors for the controls 5. Horn connectors
3. Left front-light conncector
12.
Thread each harness connector through the
appropriate headlight bracket and connect it to
the headlight
(Figure
13.
Plug the wire harness lead, with the 2
connectors, into the horn
1. Horn
2. Connectors
14.
Position the platform shroud on top of the frame
(Figure
23).
15.
Secure the shroud and the headlights to the
frame with the 2 carriage bolts and nuts you
previously removed
14
Figure 21
4. Brake connector
21).
(Figure
22).
Figure 22
3. Cable tie
(Figure
23).
g371712