Technical Features - Jacuzzi experience Virginia Instructions For Preinstallation

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13
It is the responsibility of the installer/owner to ascer-
tain compliance with specific local regulations prior to
installation.
Jacuzzi Europe S.p.A. gives no guarantee in this respect
and refuses all responsibility regarding compliance of
the installation carried out.

Technical Features

i
Virginia Experience (
1) includes:
- a control unit, called "Spa-Pak"
- the compensation tank (
required to hold water that overflows when users get into the
tub. Its nominal capacity is 1,000 litres (operating with about
800-850 litres).
i
- the Minipool (
1, C), is to be connected, with hoses, to the
"Spa-Pak", the compensation tank and the drain.
MAXIMUM ABSORPTION FOR THE SYSTEM
• version without blower
Power supply
Total consumption electric hea-
(three-phase)
ter + pumps + spotlights
Voltage
Hertz
Ampere
(*)
220 - 240 3~
50
380 - 415 3N~
50
(*): special standard (does not apply to Europe)
• version with blower
Power supply
Total consumption electrical heater
(three-phase)
+ pumps + spotlights + blower
Voltage
Hertz
Ampere
(*)
220 - 240 3~
50
380 - 415 3N~
50
(*): special standard (does not apply to Europe)
WEIGHTS
MINIPOOL
Net weight
average fill
kg
litres
~ 1700
~250
area involved
resting surface
m
2
m
2
~1,13
~5,63
Max. weight
when full
kg
COMPENSATION
~925
TANK
~285
SPA-PAK
Heat exchanger (optional)
- MAX primary circuit temperature ..............................................................50 °C
- Connections.....................................................................................................................3/4"
- Primary circuit flow rate...............................................................................38 l/min
- Primary pressure drop ......................................................................0,271 m H 2 O
i
(
1, A)
.
i
1, B) which, once connected, is
Total consumption only pumps and
spotlights (version with exchanger)
kW
Ampere
(j)
44
16,5
12
(j)
16,5
25
7
(j): Max. absorbed power
Total consumption only pumps, blower
and spotlights (version with exchanger)
kW
Ampere
(j)
17
45
13
(j)
26
17
8
(j): Max. absorbed power
maximum
water volume
max. weight
litres
~ 2100
average load on area
concentrated load on
involved
resting surface
kg/m
2
~ 418
~ 2080
resting surface
at floor level
at floor level
m
2
~1,2
~1,1
Components
Components and the necessary connections for setting up the sys-
tem are described below (see
Minipool and hosing
1
overflow channel with grid
2
pneumatic buttons
2a
box for connection of pneumatic buttons
3
low-point drain with gate valve
4A1+4B1
to the compensation tank (overflow lines)
to the compensation tank (overflow lines)
4A2+4B2
from the overflow channel (overflow lines)
4C1/4C2
5
hydromassage pump suction lines
6
hydromassage pump delivery lines
7
filtering suction line
8
suction line from the compensation tank
9
filtering return line
10
blower line
11
connections to the water system
12
perimeter metal supports
Spa-pak
13
Electric wiring box
14
optional - 14b: heater or 14a: heat exchanger
kW
15
hydromassage pumps
(j)
4,5
16
filtering pump
(j)
4,5
17
blower
18
quartz sand filter
19
safety switch
20
temperature sensor
21
flow switch (models with heater)
kW
Compensation tank
(j)
5
22
water loading/filling solenoid valve (3/4")
(j)
5
23
level switches
24
check valve
25
gate valve (for emptying)
26
pre-filters
27
overflow
Total
28, 29 ground drainage points
kg
30
gate valves (for system maintenance)
~ 2350
31
gate valves (for suction balancing)
32
hose draining (areas at risk from ice)
kg/m
2
Water connections
I
The hosing system (including connectors, gate valves, etc.,
load
2) for connecting the Minipool to the Spa-Pak and the compensa-
kg/m
2
tion tank, must be set up by the installer.
~770
~260
I
The Customer must provide the ground drainage points (
detail 27 and 28) of suitable dimensions, which can be inspected
for any cleaning, and to which the low-point drain ø 50 mm (
detail 3), the loading/overflow of the compensation tank and the
drain from the filter are to be connected.
CAUTION! Before preparing the ground drainage
points, consult the local authority for the regula-
13
i
2).
i
i
2,
i
2,

Advertisement

Table of Contents
loading

Table of Contents