Trane 4TEE3D01B1000A Installer's Manual page 6

Variable speed – communicating air handlers with integrated whole house air cleaner
Table of Contents

Advertisement

Installer's Guide
Figure 11. Remove Brackets
For Maximum Efficiency
on Upflow
Remove
and
Discard
Figure 12. Baffle Replacement
6
9. Sheetmetal screws CANNOT be used to attach
the return ductwork on the side of the unit.
10. Pedestal and unit should be isolated from the foun-
dation using a suitable isolating material.
11. Openings where field wiring enters the cabi-
net must be completely sealed. Location of
power entry is shown on the outline drawing. Use
2.5" clear stickers to seal all unused electrical
knockouts. See Figure 13.
Replace
with
Narrow
Baffle
12. After ductwork connections are made, seal air-tight
and per local codes.
13. Install FIELD CHARGER as shown in Figures 14
and 15. Ionizing pins must face downward (into the
return air stream) and electrical contacts must be
on the left side of the unit.
14. Reinstall FIELD CHARGER retainer bracket.
15. Install COLLECTION CELL as shown in Figures 14
and 15 so that electrical contacts and actuator tab
are on the left side of the unit.
16. Install filter panel with thumbscrews.
Figure 13. Electrical Knockouts
18-GE15D1-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents