Unpacking Procedures - 3Com CoreBuilder 5000 User Manual

Token ring media modules
Hide thumbs Also See for CoreBuilder 5000:
Table of Contents

Advertisement

Unpacking
Procedures
Table 3-1
Procedures for Completing Installation (continued)
Step
Procedure
8
Establish connections from the module to
devices using the appropriate connectors
and cabling. Chapter 2, Designing and
Expanding the Network, describes cabling
limitations.
9
Verify LED status for normal operation.
*
Refer to the CoreBuilder 5000 Integrated System Hub Installation and Operation Guide for
more details on hub power requirements.
For information about potential problems, consult the troubleshooting
techniques in
Chapter
To unpack your module:
1 Verify that the module is the model you ordered by checking the model
number listed on the side of the shipping carton.
Note that the product model number printed on the shipping box
differs from the model number on the product. The model number on
the shipping box contains the prefix '3C9'.
2 Remove the module, in its antistatic bag, from the shipping carton.
3 Remove the module from the antistatic shielding bag and inspect it for
damage.
Always handle the module by the faceplate, being careful not to touch
the components. If the module appears to be damaged, return it to the
antistatic shielding bag, repack it in the shipping carton, and contact
your local supplier.
Keep the shipping carton and antistatic shielding bag in which your
module was shipped for future storage or shipment.
Record the serial number of your module. The Hub Planning Charts,
located in the CoreBuilder 5000 reference binder, are provided for this
purpose.
5.

Unpacking Procedures

3-3
Section Title
Chapter 3,
Installing the
Module
Chapter 4,
LED and
Network Verification

Advertisement

Table of Contents
loading

Table of Contents