8. Select the power supply inlet you want to use (Figure A). Feed power
cable to control box, then install it through the large opening provided
in the bottom side of the box.
9. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figure C, page 15). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
10. Install control box door and screws, then reinstall the cabinet corner
and front panels.
7
2
Specifications/features subject to change without notice.
1.
Control Box
2.
Power Supply Entrance(s)
3.
2-Speed Jets Pump #1
4.
Heater
5.
Spa Drain Valve
6.
Pump Drain Plugs(s)
14
Figure a
equipment area
4
8
Figure B Control Box
2
TB1
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
11
9
1
7.
1-Speed Jet Pumps #2
8.
Circulation Pump
9.
Optional CD Ozonator (Purchase
Separately)
10. Factory Installed Ozone Injector
11. Control Panel