Preparing materials and tools

Preparing materials and tools
• You must keep the installation manual until the installation is
finished.
• Hand over the installation manual to the customer after
finishing the installation.
Installation manual (1)
Optional accessories
• Following optional accessories are needed for connecting
pipes between the indoor and outdoor units.
Classification
MXJ-YA1509M
MXJ-YA2812M
Y-Joint
MXJ-YA2815M
MXJ-YA3419M
MXJ-YA4422M

Outdoor unit installation

WARNING
• Make sure to remove the wooden pallet before installing the
outdoor unit. If you do not remove the wooden pallet, there
is risk of fire during welding the pipes. If the outdoor unit is
installed with wooden pallet on, and it was used for long period
time, wooden palette may break and cause electrical hazard or
high pressure may damage the pipes.
※ Fix an outdoor unit firmly on the base ground with anchor
bolts.
※ Manufacturer is not responsible for the damage occurred by
not following the installation standards.
1 Make sure that the height of the base ground is 200mm or
higher to protect the outdoor unit from rain water or other
external conditions. Also, install a draining pit around the base
ground and connect the drain pipe to the drainage.
2 Considering the vibration and weight of the outdoor unit,
strength of the base ground must be strong to prevent noise
and the top surface of it should be flat.
3 Base ground should be 1.5 times larger than the bottom of the
outdoor unit.
4 Outdoor unit must be fixed firmly so that it can withstand the
wind speed of 30m/s. If you cannot fix the outdoor unit on the
base ground, fix it by side or use extra structure.
12
English
Model Name
Specification
15.0 kW and below
15.1 kW ~ 40.0 kW
MXJ-YA2512M
40.1 kW ~ 45.0 kW
45.1 kW ~ 70.3 kW
70.4 kW ~ 98.4 kW
MXJ-YA4119M
98.5 kW ~ 135.2 kW
Over 135.2 kW
Classification
Model Name
MXJ-YA1500M
MXJ-YA2500M
Y-Joint (Only H/R)
MXJ-YA3100M
MXJ-YA3800M
MXJ-HA2512M
Distribution header
MXJ-HA3115M
MXJ-HA3819M
MXJ-TA3419M
Y-Joint
- Outdoor unit
MXJ-TA4122M
MXJ-TA3100M
Y-Joint (Only H/R)
- Outdoor unit
MXJ-TA3800M
※ If you use an indoor unit with no internal EEV(Electric
Expansion Valve), you will need an EEV kit.
※ Only use the genuine accessories listed in above table and do
not use imitated accessories.
5 In heating operation, defrost water may form so you must
really care about the drainage and waterproofing the floor. To
prevent defrost water from stagnating or freezing, construct
a drainage with over 1/50 slope. (Ice may form on the floor in
winter season.)
6 It is necessary to add wire mesh or steel bar during concrete
construction for the base ground to prevent damages or
cracks.
7 When installing multiple outdoor units at the same place,
construct an H beam or an anti-vibration frame on the base
ground to install the outdoor unit.
8 After installing an H beam or an anti-vibration frame, apply
corrosion protection and other necessary coating.
9 When concrete construction for outdoor unit installation is
completed, install an anti-vibration pad (t=20mm or more) or
an anti-vibration frame to prevent vibration of the outdoor unit
from transferring to the base ground.
10 Place the outdoor unit on an H beam or an anti-vibration frame
and fix it with the bolt, nut and washer. (The bearing force has
to be over 3.5kN)
Specification
22.4 kW and below
22.5 kW ~ 70.3 kW
70.4 kW ~ 135.2 kW
Over 135.2 kW
45.0 kW and below
(for 4 rooms)
70.3 kW and below
(for 8 rooms)
70.4 kW ~ 135.2 kW
(for 8 rooms)
135.2 kW and below
Over 135.2 kW
135.2 kW and below
Over 135.2 kW