Base ground construction
Draining pit
Over 200
<When installing on the ground>
Outdoor unit installation
Over
200
Outdoor unit base mount and anchor
bolt position
A
B
Anti-vibration - Base ground
(4-Ø 18)
(Unit : mm)
Bottom surface of the base ground
must be horizontally leveled
Over 200
<When installing on the roof>
(Unit : mm)
Base
ground
H beam or anti-
vibration frame
(Unit : mm)
Outdoor unit - Anti-vibration
frame (4-Ø 12)
DVM S2 Small Type
Classification
(mm)
W930 x H1695 x D765
930
A
790
B
※ Refer to the blueprints in technical data book to make a holes
for connecting the anti-vibration pad.
Examples of draining work
• Construct the drainage ditch with reinforced concretes and
make sure that water-proofing work is done.
• For smooth draining of defrost water, make sure to apply 1/50
slope.
• Construct a drainage around the outdoor unit to prevent
the defrost water (from the outdoor unit) from stagnating,
overflowing or freezing near the installation space.
• When the outdoor unit is installed on the roof, check the
strength and waterproof status of the roof.
X
100
<Drainage work for single installation>
<X-X' SECTION>
240
B
240
<Drainage work for module installation>
Classification
DVM S2 Small Type
A
1030
790
B
(Unit : mm)
DVM S2 Large Type
W1295 x H1695 x D765
1295
1155
(Unit : mm)
X'
Direction of
the drainage
B
(Slope 1/50)
A
150
100
Direction
of the
B
drainage
(Slope 1/50)
(Unit : mm)
DVM S2 Large Type
1395
1155
English