Greenlee Cam Track 881 Instruction Manual page 17

Hydraulic benders and bending table
Table of Contents

Advertisement

Available languages

Available languages

Assembly and Operation Instructions
881 and 881CT with 1813 Bending Table (cont'd)
35. Position the vise unit at a distance from the pump
support so that the vise unit will not contact the
pump support before the bend is complete. Clamp
the conduit down in the vise unit.
Saddle
Pin
36. Push the follow bar back (to the right in the illustra-
tion) until the follow bar foot contacts the bender
mounting unit. Position the saddle and saddle pin
(M) where they can be reached for assembly.
37. Rock the bender frame as shown and rotate the
shoe back for the assembly of the saddle and pin.
Greenlee Tools, Inc.
881 and 881CT Hydraulic Benders
38. Hold the shoe against the conduit and position the
saddle so the saddle insert is toward the operator.
Align the hole in the saddle with the hole in the shoe
and insert the saddle pin (M). Secure the saddle pin
with the hitch pin clip (E).
Saddle Insert
Saddle
39. Allow the bender to rock forward and ensure that
the follow bar comes forward with it, so that the
follow bar contacts the saddle.
Follow the instructions and safety information
supplied with your hydraulic pump.
Align bending mark with
front edge of saddle insert.
40. Rotate the pump control lever counterclockwise.
Activate the hydraulic pump until the shoe just con-
tacts the conduit. Check that the saddle and follow
bar are snug, and that the follow bar is against the
saddle, as shown. Be sure that the bending mark
on the conduit is aligned with the front edge of
the saddle insert. Attach the model 1805 Bending
Degree Indicator (35) to the conduit. Zero the indica-
tor by rotating the degree wheel.
17
4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cam track 881ct1813881ctde980

Table of Contents