Power Supply Unit - Furuno FSV-25 MARK-2 Installation Manual

Color scanning solar
Table of Contents

Advertisement

2. WIRING
Cable clamp location
Secure the cables in the cable clamp as shown in the following figure.
Use a ground wire (IV-8 sq., local supply) to connect to the ship's ground.
TPYCY-4
Ship's mains
2.7

Power Supply Unit

Fabricate the power cable (DPYCY-2.5, supplied locally), referring to the following fig-
ure. Change the connector to the power supply according to the input voltage.
Input
1 2 3
For
115 V
For
230 V
220/230 V
100/110/115 V
Breaker settings
2-16
10CA10053
Transceiver unit (FSV-251-MK2)
Limit
Limit
switch
switch
10CA10029
10CA10027 (Wrap extension
Shaft brake
box installation materials
motor
DK020FR-19 on cable ends.
Connected to hull unit (or control box extension box)
Cut the outer sheath and
armor at the same location.
Output
4 5 6 7
8 9
Anticorrosive
sheath
Cable type
For
110 V
DPYCY-2.5
200 V
DPYCY-1.5
WARNING
Only set one breaker to ON position at
any time.
Setting both breakers to ON can result in
high voltage in the unused terminal block.
Rotary
Rotary
encoder
encoder
10CA10028
Inertial measurement unit,
Emergency stop button
100mm
100mm
Clamp the
vinyl sheath.
Seal cut ends with insulated tape.
Voltage
Length of "L" Crimp-on lug
100/110/115 V
220/230 V
200 V
IV-8sq.
Ship's ground
L L
Cores
250 mm
FV2-5
180 mm
180 mm
FV2-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsv-25s mark-2

Table of Contents