Download Print this page

Mitsubishi Electric PURY-M200YNW-A1 Service Handbook page 419

Hide thumbs Also See for PURY-M200YNW-A1:

Advertisement

[8-15 Main-HBC Maintenance Instructions ]
Name
Torque wrench
(Range: 11-13 N·m)
Brush or sponge
<<Note>> Don't let the coating area get hairy
when using the brush.
Appropriate amount of methyl silicone oil
(Viscosity: 1000 mm
(Flash point: 300°C or above)
(Freezing point: -50°C or below)
(3) Assembly sequence
Operation procedures
1) Note to keep the work bench at the level state.
<<Important>>
Make sure bubbles are located between the two lines of the level.
2) Remove the stationary ring of the mechanical seal (part 8), and coat
it with methyl silicone oil evenly (soaked).
3) Install the stationary ring of the mechanical seal (part 8) into the water
outlet body (part 7) (with the smooth surface facing upwards).
<<Note>>
When loading, the static ring of mechanical seal shall not be skewed and
shall be installed in place.
152
- chapter 8
Specifications
-
-
2
/s, 25°C
-
Photo
-
-
Illustrations
Mechanical seal static ring
Mechanical seal static ring
Water outlet body
BS_08_L

Hide quick links:

Advertisement

loading