Furuno SEARCHLIGHT CH-250 Installation Manual page 25

Searchlight sonar
Hide thumbs Also See for SEARCHLIGHT CH-250:
Table of Contents

Advertisement

11. Face the bow mark on the soundome with the bow mark on the shaft sleeve, and then fix
the main shaft with and shaft retainer.
12. Fix the jubilee clip to the main shaft.
Note: Attach the shaft retainer so it is 15 mm from the top of the shaft. The soundome is then
placed 10 mm above the bottom of tank when retracted.
13. Insert grease cotton (supplied with shaft sleeve), and fix them with the cotton retainer as
follows.
a) Wind grease cotton onto main shaft.
b) Mark on the cotton as below.
c) Remove the cotton from the shaft, and then cut it at the position of the mark. Discard the ends.
d) Wind cottons as shown below.
e) Push cottons into the main body flange.
Tighten the grease cotton retainer.
f)
Cotton retainer
14. Fasten the pipe cap (supplied) to main shaft.
15. Unscrew 10 pcs of M5X35 socket head cap screws with soundome fixing tool to separate
soundome.
Shaft retainer
Wind grease cotton
onto main shaft and
cut it as shown below.
Spring washer
Installing grease cotton on the main shaft
15
Hex. bolt
15 mm
1-2 mm
Jubilee Clip
Main shaft
Space joints of grease cotton
120 apart and push them into
body flange.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch-250s

Table of Contents