UNPACKINg ANd CLEANINg
Carefully unpack the machine and all loose items from the shipping container(s). Remove the rust-preventative oil from
unpainted surfaces using a soft cloth moistened with mineral spirits, paint thinner or denatured alcohol.
do not use highly volatile solvents such as gasoline, naphtha, acetone or lacquer thinner for cleaning your
machine.
After cleaning, cover the unpainted surfaces with a good quality household floor paste wax.
1. The saw was packed at the factory with support blocks
(A) Fig. A1 under the cutter-head (B) and the track arm
(C). Shipping boards (D) Fig. A1 were fastened to saw
base (G). To prevent damage during shipment, the
track arm elevating knob (H) was removed from the
lever (E). Insert the post of the knob (H) Fig. A2 through
the hole in the lever (E). Attach the E-ring (K) to the slot
in the post.
2. You can remove the support blocks (A) Fig. A1 by rotating
the track arm elevating knob (H) clockwise. Remove the
shipping boards (D) by taking out the hold-down screws
(not shown), located inside the saw base. Discard the
support blocks (A) and the shipping boards (D).
3
The saw with the support blocks and shipping boards
removed is illustrated in Fig. A3.
Fig. A2
To reduce the risk of injury, turn unit off and disconnect it from power source before installing and remov-
ing accessories, before adjusting or when making repairs. An accidental start-up can cause injury.
H
E
K

ASSEMBLY

ASSEMBLY TOOLS REQUIREd
7/8" Open End - 1/2" Box Wrench (included)
7/8" x 1/2" Box Wrench (included)
1/2" and 3/8" Wrenches, Open End or Socket
Flathead Screwdriver
ASSEMBLY TIME ESTIMATE
Assembly for this machine takes approximately 2-3 hours.