Ariston HS PREMIUM Technical Instructions page 3

Condensing wall thermal power plant
Table of Contents

Advertisement

Machine Translated by Google
INSTALLATION AND FIRST START-
UP (FIRST START-UP)
OF THE POWER PLANT MUST
BE CARRIED OUT BY QUALIFIED
PERSONNEL IN ACCORDANCE WITH THE
NATIONAL INSTALLATION RULES IN
FORCE AND THE POSSIBLE PROVISIONS
OF LOCAL AUTHORITIES AND HEALTH
INSTITUTIONS.
AFTER THE FIRST START OF THE
POWER PLANT, THE TECHNICIAN MUST
INFORM THE END USER ABOUT
POWER PLANT OPERATION AND SAFETY
DEVICES.
This appliance is intended for the production of
domestic hot water for domestic use and heating for
heating.
It must be connected to a heating system and to the
domestic hot water distribution network compatible
with its capacities and powers.
Use for purposes other than those specified are
prohibited. The manufacturer is not responsible for
any malfunctions caused by improper, incorrect and
improper use or for failure to follow the instructions
in this manual.
Installation, maintenance (overhaul) and any other
intervention must be carried out in accordance with
the regulations in force and in accordance with the
instructions provided by the manufacturer. Improper
installation can cause damage to persons, animals
and property and for which the construction company
is not responsible.
The boiler is supplied on a pallet, in a cardboard
package, after removing the packaging, check the
integrity of the appliance and make sure that the
items supplied are complete. In case of non-
compliance, contact your supplier.
Packaging materials (plastic bags, plastic bags, etc.)
must not be left out of the reach of children, as they
are a source of danger.
In the event of a malfunction and / or malfunction,
switch off the appliance, close the gas valve and do
not attempt to repair it yourself, contact qualified
personnel.
Before any maintenance (overhaul)
/ boiler repair, you must switch off the boiler by
turning the external bipolar switch to the "OFF"
position.
Any repairs carried out using only original spare
parts must be carried out only by qualified technicians.
Failure to observe the above instructions could
compromise the safety of the device and the
manufacturer is not responsible for it.
When working or overhauling structures located near
flue pipes or fittings and their accessories, turn off
the appliance by placing the external bipolar switch
in the "OFF" position and closing the gas valve. At
the end of the work, have qualified personnel check
the efficiency of the pipes or devices.
To clean the external components, switch off the
boiler and set the external switch to the "OFF"
position.
Clean with a cloth dampened with soap and water.
Do not use harsh detergents, insecticides or toxic
products.
Compliance with current regulations allows for safe,
environmentally friendly operation and energy
savings. When using a kit or an optional one, the
original ones must be used.
CE markings
The CE mark guarantees the conformity of the device with the following
directives:
- 2009/142 / EEC on gas appliances
- 2004/108 / EC on electromagnetic compatibility
- 92/42 / EEC on energy efficiency
"
only art.7 (& 2), art.8 and annex from III to v -
2006/95 / EC on electrical safety
-
2009/125 /
EC Energy Impact Products - 813/2013
Delegated Regulation (EU)
GENERAL
"
/
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

33007613300765

Table of Contents