Before Starting - Agilent Technologies 5975 MSD Operation Manual

For openlab cds
Hide thumbs Also See for 5975 MSD:
Table of Contents

Advertisement

4
General Maintenance

Before Starting

You can perform much of the maintenance required by your MSD. For your
safety, read all of the information in this introduction before performing any
maintenance tasks.
Table 16
Maintenance schedule
Task
Tune the MSD
Check the foreline pump oil level
Check the calibration vial(s)
Replace the foreline pump oil
Replace the diffusion pump fluid
Check the dry foreline pump
Change the dry foreline pump tip seal
Change the foreline pump exhaust filter
Clean the ion source
Check the carrier gas trap(s) on the GC and MSD
Replace the worn out parts
Lubricate sideplate or vent valve O-rings
Replace GC gas supplies
*
Vacuum seals other than the side plate O-ring and vent valve O-ring do not need to be lubricated. Lubricating other seals
can interfere with their correct function.
Scheduled maintenance
Common maintenance tasks are listed in
when scheduled can reduce operating problems, prolong system life, and
reduce overall operating costs.
86
Every week
X
*
Every 6 months
Every year
X
X
X
X
Table
16. Performing these tasks
5975/5977 Series MSD Operation Manual
As needed
X
X
X
X
X
X
X
X

Advertisement

Table of Contents
loading

This manual is also suitable for:

5977 msd

Table of Contents