10 -Installation; Location Notes; Positioning And Water Connection; Electric Connection - Gaggia Concetto Operating Instructions Manual

Gaggia concetto: operating instruction
Hide thumbs Also See for Concetto:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 28
10 - INSTALLATION
10.1

Location notes

• The machine has to be installed in a dry and protected place,
at the following ambient temperature : 10 C - 40 C; maximum
humidity: 90%.
10.2

Positioning and water connection

NOTE - Check if the surface where the machine is installed has
the adequate dimension and solidity to support the
machine safely.
• Drill a hole in the support (A - F. 5).
• Place the machine on the support and insert the electric power
cord (B - F. 5) in the hole (A).
• Connect a drain tube to the coupling (C - F. 6) and fix it with a
rack clamp.
• Connect (using tube and coupling made of food materials only)
the machine to the drinking water network, through the coupling
(D - F. 6).
We suggest supplying the machine with water treated with
a descaling device, above all in case of a high calcium
and magnesium content (hard water).
• Place definitely the machine on the support (the circles E - F. 5,
indicate the suitable position of the adjustable feet).
• Level off the machine using the adjustable feet (F - F. 6).
E
MACHINE FRONT
E
F. 5
CONCETTO
F
B
F. 6
10.3

Electric connection

NOTE - In case of plants with a 400 V two-phase current, use
the two phases to supply the machine with 230 V single
phase current (F. 7). As for the 230 V single-phase
connection, require the special installation kit (code
%1034.R09).
Neutral (N) – Blue
Phase (L
Phase (L
Ground – Yellow/green
F. 7
E
Connection of the two phase electric line plug 400 V2N~
(Switzerland)
A
L
1
E
L
2
F. 8
30/120
) – Brown
1
) – Black
2
Power cord type H07RNF
section 4x2,5 mm
CH
N
English
C
D
2
CEI
L
2
L
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents