Eradicator Gen II O
Gen II O
Installation
Ozone Resistant Air Draw Check Valve Assembly
Note:
There is no check valve in the bottom of
the brine fitting like is found in standard
Eradicator. Brine flow control is also re-
moved for operating with ozone.
Figure c
Locking Collar
Figure a
These components should only be serviced by qualified
technicians.
7
with Ozone
3
Tygon
Tubing
Figure b
Ozone Resistant
Check Valve
Note:
Copyright ©2021 Aqua Systems, All Rights Reserved • 404 Moravian Valley Road, Waunakee, WI 53597
3
Install & Service Guide
The ozone resistant check valve
is pre-inserted into the 3/8" Tygon
tubing.
Tygon tubing is inserted and
seated in the push connect
fitting.
Firmly insert the black tubing
(figure b) from the EOG II
into the push connect elbow
(figure a). Be sure the tubing
has fully seated.
If the tubing needs to be
removed from the elbow,
press the locking collar (figure
c) flush with the fitting and pull
out the tubing.
Manual Supplement
Ozone Resistant
Check Valve
Tubing to Elbow
Installation