Installation Of The Eog Ii; Installation - Inlet Check Valve Position; Power Supply For Ozone Generator - Hellenbrand AQUA Systems SmartChoice Gen II O3 Installation, Operation And Service Manual

Eradicator with eog ii ozone
Table of Contents

Advertisement

Eradicator Gen II O
Gen II O
Installation
Power Supply
Transformer Jack
Insert Power
Supply Plug Here
To mount the EOG II to
the control valve, slide
the mounting ring over
the injector cap, then
attach the lower clip
to the inlet part of the
valve body. Then snug
the clamp screw to
secure the EOG II to
the control valve.
6
with Ozone
3
Mounting
Clamp Set
Clamp
Screw
Lower Clip
Copyright ©2021 Aqua Systems, All Rights Reserved • 404 Moravian Valley Road, Waunakee, WI 53597
3
Power Supply Plug
Inlet Check
Valve
Install the Vertical
Adapter Elbow with
check valve to the
INLET port of the
bypass.
Then attach the
Bypass to the Control
Valve.
Manual Supplement
Install & Service Guide
Attach O
outlet tube
3
see page 7, figures a & b
Note:
Make sure the Vertical
Adapter w/check valve is
installed facing down.

Advertisement

Table of Contents
loading

Table of Contents