Exmark 116-8430 Operator's Manual page 9

Operator controlled discharge-hand
Table of Contents

Advertisement

Vantage 36
1. Flip up discharge
deflector
2. Adapter kit
Vantage 36
1. Hairpin
2. Cable bulkhead jam nuts
3. Cover (hidden for clarity)
4. Knob
5. RH front deck lift bracket clearance hole
3.
Pivot the assembly towards the deck. The front
pin should engage into the slot in the deck or
adapter as shown in Figure 6.
Figure 4
3. Operator Controlled
Discharge accessory
assembly
Figure 5
g020057
1. Latch
2. Operator Controlled
Discharge accessory
assembly
• If the front pin does not engage in the slot
in the deck or adapter, loosen or completely
remove the hardware in the gate link frame
as shown in Figure 7. Position the gate link
frame so that the front pin aligns with the slot.
Reinstall hardware, if removed, and tighten.
Pivot the assembly towards the deck and
engage the front pin into the slot.
g020058
1. Gate link frame
2. Adjustment slots
3. Hardware
• Due to manufacturing variance, the gate
link frame may not close and have complete
contact all around the discharge opening.
Any gaps are to be minimized. If the rear of
the gate link frame contacts the mower deck
while rotating it towards the deck creating a
gap at the front, use the steps below to install
9
Setup
Figure 6
3. Front pin
4. Slot
Figure 7
4. Shim (storage position)
5. Pivot mount assembly
6. Shim (installed position)
g020069
g020070

Advertisement

Table of Contents
loading

Table of Contents