Commissioning And Diagnosis; Commissioning And Start-Up Of Ifn Ai-D; Software Requirements; Requirements For Commissioning - Siemens SIPLUS CMS4000 Operating Instructions Manual

Table of Contents

Advertisement

Operating Instructions SIPLUS CMS4000 IFN AI-D
5

Commissioning and Diagnosis

5.1

Commissioning and Start-up of IFN AI-D

5.1.1

Software Requirements

Tabelle 9 Software requirements for the commissioning
Eingesetzte Projektierungssoftware
SIPLUS CMS X-Tools
5.1.2

Requirements for Commissioning

1. IFN AI-D mounted (view chapter 3).
2. IFN AI-D wired (view chapter 4).
5.1.3

Commissioning of IFN AI-D

Power On
no
Power LED
flashing?
yes
Startup ready
no
LNK LED
on?
yes
Connection between PC
and X-Tools is established
no
LNK LED
flashing?
yes
Start of transmitting
data
Picture 12
SIPLUS CMS4000 IFN AI-D
Operating Instructions, 07/2021, A5E32612781A-AB
Verify IEEE1394 bus and
X-Tools device driver
Diagnosis via X-Tools
no
CH LED
CH LED
off?
yes
No error or
Broken sensor
Channel
cable
switched off
Start-up IFN AI-D
flashing
Version
starting version 4.00 and
higher
23

Advertisement

Table of Contents
loading

Table of Contents