Installing The Ap; Installation Flowchart; Pre-Installation Tasks; Determining The Installation Position - H3C WA6638 Manual

Table of Contents

Advertisement

2

Installing the AP

Installation flowchart

Figure 2-1 Installation flowchart
Wall mounting

Pre-installation tasks

Before installing the AP, perform the following tasks:
Connect the AP to a power source and the network. Examine the LEDs to verify that the AP is
operating correctly. For information about AP LEDs, see "LEDs."
Record the MAC address and serial number at the rear of the AP for future use.

Determining the installation position

Determine the installation position by observing the following principles:
Few obstacles such as wall exist between the AP and clients.
The AP is far away from electronic devices (such as microwave oven) that might generate
radio frequency (RF) noise.
The AP does not hinder people's daily work and life.
The place is not water seeping, water soaking, or condensing.
Start
Complete pre-installation tasks
Determine
the mounting option
Install the AP
Connect the AP to the power
source
Connect the AP to the network
End
Ceiling mounting
2-1

Advertisement

Table of Contents
loading

Table of Contents