Standby
1. Close the abrasive ball valve (M).
M
To prevent material from packing out and damaging
the blast hoses, do not shut off your air compressor
during Standby.
2. Turn the selector valve (W) to OFF.
W
3. Open the pot dump valve (J) until the pot pressure
gauge reaches 0 psi.
3A7467D
NOTICE
Shutdown
To prevent material from packing out and
damaging blast hose, ensure that the abrasive ball
valve is fully closed before shutting off your air
compressor.
1. When you have finished blasting, use the wash
feature to flush all abrasive from the blast hose. See
Use the Wash Feature, page 24.
2. Turn the selector valve to OFF, and with the
abrasive ball valve closed, continue to blast until
water is cleared from the hose. This is to dry the
inside of the hose for storage.
3. Perform the Pressure Relief Procedure procedure,
page 19.
J
NOTICE
Operation
25