Installing The Control Center; Final Power Connections - Bosch MAP 5000 Series Installation Manual

Hide thumbs Also See for MAP 5000 Series:
Table of Contents

Advertisement

MAP 5000
3.9

Installing the control center

Mounting location
Mount the control center onto the wall so that the user interface is at a comfortable level for
the end user. Typical installations of the touchscreen are at shoulder level, which is
approximately 150 to 160 cm (59 to 62 in) above the floor. It must be guaranteed by
corresponding positioning of the control center or by organizational measures that only the
user has an optimum view of the touchscreen.
Mounting the control center
1.
2.
3.
4.
5.
6.
7.
Opening the control center
3.10

Final power connections

1.
2.
3.
4.
Warning!
Ensure that the AC LED indicator on the power supply turns on steady before you connect the
!
battery terminal to the power supply.
Bosch Security Systems B.V.
Unlock the control center base and remove the cover.
Use the control center base to mark the holes on the mounting surface.
Refer to Data bus connection of the control center on the external BDB, page 45 for wiring
instructions.
Replace the control center cover on the base.
The cover automatically locks to the base.
Secure the cover using the two screws M3 x 20 mm (F.01U.172.636).
The fed-in cable must be provided with strain relief.
The adhesive seal must be attached after completion of all work.
Connect AC wires to the AC terminal block.
Connect the battery wire leads to the batteries.
Do not connect the batteries to the power supply at this time.
Switch the AC breaker on.
Ensure that there are no power-related trouble conditions.
Installation manual
Connections | en
55
2019-09 | 25 | F.01U.168.332