HP 5130-24G-4SFP+ EI Installation Manual page 66

5130 ei switch series
Table of Contents

Advertisement

planning IRF cabling scheme, 30,
topology (IRF fabric),
29
troubleshooting
built-in power supply failure,
configuration terminal problems,
garbled terminal display,
hot-swappable power supply failure,
no terminal display,
power supply failure,
switch,
34
V
verify the IRF fabric setup,
verifying
IRF fabric setup,
32
switch installation (19-inch rack),
VT100,
23
W
workbench
mounting switch,
30
34
36
36
35
36
34
32
21
12
64

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5130-24g-4sfp+ ei taa5130-24g-poe+-4sfp+ ei5130-24g-poe+-4sfp+ ei taa5130-48g-4sfp+ ei5130-48g-4sfp+ ei taa5130-48g-poe+-4sfp+ ei ... Show all

Table of Contents