E E q q u u i i p p m m e e n n t t D D a a m m a a g g e e ! !
A A l l l l m m o o u u n n t t i i n n g g b b o o l l t t s s m m u u s s t t b b e e t t h h e e c c o o r r r r e e c c t t l l e e n n g g t t h h f f o o r r t t h h e e i i r r a a p p p p l l i i c c a a t t i i o o n n s s a a n n d d t t o o r r q q u u e e d d t t o o s s p p e e c c i i f f i i c c a a t t i i o o n n . . I I n n c c o o r r r r e e c c t t b b o o l l t t
l l e e n n g g t t h h s s a a n n d d i i m m p p r r o o p p e e r r t t o o r r q q u u e e s s p p e e c c i i f f i i c c a a t t i i o o n n s s c c a a n n d d a a m m a a g g e e e e q q u u i i p p m m e e n n t t . .
Unit mounting bolts are installer supplied and must meet the following requirements:
Bolt Size and Thread Pitch
Grade
Finish
Length
Torque Specifications
Important: Apply blue thread locker to all four (4) unit mounting bolts during unit installation.
Figure 18. Confirm a minimum of 2 thread pitches extend beyond the surface of the nut.
30
N N O O T T I I C C E E
1/2–13 UNC, Full Thread
SAE Grade 5 (ISO 8.8)
Zinc Dichromate, Cadmium Plated.
The length of each of the four mounting bolts protruding from the front wall of the cargo box is
shown in the illustration.
•
Three bolts are the same length.
•
One bolt is longer.
•
After unit is installed, a minimum of 2 thread pitches must extend beyond the surface of the nut.
Thermo king t-590 smartpower model 50Thermo king t-690 model 30Thermo king t-690 model 30 maxThermo king t-690 smartpower model 50Thermo king t-690 smartpower model 50 maxThermo king t-890 model 30Thermo king t-890 model 30 maxThermo king t-890 smartpower model 50Thermo king t-890 smartpower model 50 maxThermo king t-1090 model 30Thermo king t-1090 model 30 maxThermo king t-1090 smartpower model 50Thermo king t-1090 smartpower model 50 maxThermo king t-1090 spectrum model 30Thermo king t-1090 spectrum smartpower model 50