Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
6
Commissioning steps
Inspection steps
Maintenance steps
1. Filling the heating system..............................................
2. Checking all connections on the heating water side
for leaks
3. Switching the power ON................................................
5. Checking outputs and actuators...................................
6. Adjusting the heating curves........................................
7. Shutting down the system............................................. 12
8. Cleaning the combustion chamber............................... 12
10. Emptying the ash pans (if required)............................. 13
11. Checking the function of safety valves
12. Instructing the system user........................................... 13